cm/controlmapping
中文
来源
恢复 (RC) · 主题

灾难恢复

制定并执行灾难恢复程序。

灾难恢复由以下 NIST CSF 2.0 成果定义:RC.RP-02 (Recovery actions are selected, scoped, prioritized, and performed); RC.RP-05 (The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed); PR.IR-03 (Mechanisms are implemented to achieve resilience requirements in normal and adverse situations)。 对照映射 通过 ISO 27001, PCI DSS, 800-53, HIPAA 和 NIS2 中已发布的对照表完成映射。 编辑说明 在 CIS v8.1, SOC 2, GDPR, Essential Eight 和 DORA 中经编辑映射。 弱相关 在 CMMC 中仅弱相关。 本站数据中无映射 本站数据中 CPS 234 和 Cyber Essentials 无映射。

由……定义RC.RP-02 RC.RP-05 PR.IR-03 (NIST CSF 2.0) 框架14 个主题中有 11 个已有映射要求
← 覆盖矩阵
按框架列出的 灾难恢复 要求
框架要求标题链接来源 / 原因
NIST CSF 2.0RC.RP-02RC.RP-05PR.IR-03Recovery actions are selected, scoped, prioritized, and performed; The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed; Mechanisms are implemented to achieve resilience requirements in normal and adverse situations主题定义
RC.RP-02
RC.RP-05
PR.IR-03
ISO 27001A.5.30A.8.14ICT readiness for business continuity; Redundancy of information processing facilities对照映射
A.5.30: via RC.RP-02
A.8.14: via PR.IR-03
CIS v8.1CIS 11.1Establish and Maintain a Data Recovery Process编辑说明
CIS 11.1: Establish a data recovery process; not in CIS's own crosswalk to CSF 2.0, which covers 49 of 153 safeguards.
SOC 2A1.2A1.3Environmental protections, backups and recovery infrastructure; Testing recovery plan procedures编辑说明
AICPA's TSC mappings are not openly licensed; ControlMapping editorial mapping (criterion summaries are ours, not AICPA text).
PCI DSS12.10.1Incident response plan ready to activate对照映射
12.10.1: via RC.RP-02; PR.IR-03
CMMCIR.L2-3.6.1SC.L2-3.13.2未映射到此主题弱相关这些要求仅通过已发布的交叉映射与本主题的 CSF 成果(RC.RP-02, RC.RP-05, PR.IR-03)存在关联:值得核查,但不构成映射。
800-53CP-7CP-10Alternate Processing Site; System Recovery and Reconstitution对照映射
CP-7: Alternate processing site; NIST's CSF 2.0 references don't link CP-7 to these subcategories.
CP-10: via RC.RP-02; RC.RP-05
HIPAA§164.308(a)(7)(ii)(B)§164.308(a)(7)(ii)(D)Disaster Recovery Plan; Testing and Revision Procedure对照映射
§164.308(a)(7)(ii)(B): via NIST HIPAA map: CP-10
§164.308(a)(7)(ii)(D): Testing and revision of contingency plans; NIST maps it to CP-2/CP-3/CP-4.
GDPRArt.32(1)(c)Security of processing编辑说明
Art.32(1)(c): No official crosswalk exists for GDPR; ControlMapping editorial mapping.
NIS24.14.2Business continuity and disaster recovery plan; Backup management对照映射
4.1: via RC.RP-02; ENISA ISO map: A.5.30
4.2: via RC.RP-02; ENISA ISO map: A.8.14
Essential EightISM-1515Restoration of data, applications and settings from backups to a common point in time…编辑说明
ISM-1515: ASD assigns these ISM controls to the Essential Eight; ASD publishes no crosswalk to NIST or ISO, so linking them to topics is ControlMapping editorial.
DORAArt.12(4)Art.11(6)Backup policies and procedures, restoration and recovery procedures and methods; Response and recovery编辑说明
Art.12(4): Redundant ICT capacities adequate to business needs.
Art.11(6): Testing includes switchovers between primary infrastructure and redundant capacity, backups and facilities.
CPS 234—无要求本站数据中无映射本站数据中没有 CPS 234 要求映射到此主题。
Cyber Essentials—无要求本站数据中无映射本站数据中没有 Cyber Essentials 要求映射到此主题。

主题定义 定义本主题的 CSF 2.0 结果 · 对照映射 至少一项选择有已发布对照表作为依据 · 编辑说明 ControlMapping 的判断及理由 · 弱相关 未映射,仅与该主题的 CSF 成果相同 · 本站数据中无映射 我们的数据中未映射任何内容;通常为新工作,但请查看覆盖范围说明. 方法说明.

要求编号和标题均按各框架官方发布的英文原文显示。

映射有误或缺失? 报告

关于灾难恢复

灾难恢复(DR)提供在勒索软件攻击、数据中心中断或自然灾害等重大事件之后,恢复IT基础设施、应用程序和数据所需的技术能力与程序。DR规划包括为每个关键系统定义恢复时间目标(RTO)和恢复点目标(RPO),建立冗余基础设施或基于云的故障切换环境,并记录分步骤的恢复程序。定期测试(在风险可证明必要时包括完整的故障切换)可以验证恢复目标能否真正达成,以及员工是否能够执行这些程序。

相关主题