Pemulihan Bencana
Merencanakan dan menjalankan prosedur pemulihan bencana.
Pemulihan Bencana didefinisikan oleh hasil-hasil NIST CSF 2.0 RC.RP-02 (Recovery actions are selected, scoped, prioritized, and performed); RC.RP-05 (The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed); PR.IR-03 (Mechanisms are implemented to achieve resilience requirements in normal and adverse situations). Crosswalk Dipetakan melalui crosswalk yang dipublikasikan dalam ISO 27001, PCI DSS, 800-53, HIPAA dan NIS2. Editorial Dipetakan secara editorial dalam CIS v8.1, SOC 2, GDPR, Essential Eight dan DORA. Hanya terkait secara longgar dalam CMMC. Tidak ada pemetaan dalam data kami Tidak ada pemetaan dalam data kami untuk CPS 234 dan Cyber Essentials.
| Kerangka kerja | Persyaratan | Judul | Tautan | Sumber / alasan |
|---|---|---|---|---|
| NIST CSF 2.0 | RC.RP-02RC.RP-05PR.IR-03 | Recovery actions are selected, scoped, prioritized, and performed; The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed; Mechanisms are implemented to achieve resilience requirements in normal and adverse situations | Definisi topik | RC.RP-02 RC.RP-05 PR.IR-03 |
| ISO 27001 | A.5.30A.8.14 | ICT readiness for business continuity; Redundancy of information processing facilities | Crosswalk | A.5.30: via RC.RP-02 A.8.14: via PR.IR-03 |
| CIS v8.1 | CIS 11.1 | Establish and Maintain a Data Recovery Process | Editorial | CIS 11.1: Establish a data recovery process; not in CIS's own crosswalk to CSF 2.0, which covers 49 of 153 safeguards. |
| SOC 2 | A1.2A1.3 | Environmental protections, backups and recovery infrastructure; Testing recovery plan procedures | Editorial | AICPA's TSC mappings are not openly licensed; ControlMapping editorial mapping (criterion summaries are ours, not AICPA text). |
| PCI DSS | 12.10.1 | Incident response plan ready to activate | Crosswalk | 12.10.1: via RC.RP-02; PR.IR-03 |
| CMMC | IR.L2-3.6.1SC.L2-3.13.2 | Tidak dipetakan ke topik ini | Persyaratan ini hanya berbagi hasil CSF topik ini (RC.RP-02, RC.RP-05, PR.IR-03) melalui crosswalk yang diterbitkan: layak diperiksa, bukan pemetaan. | |
| 800-53 | CP-7CP-10 | Alternate Processing Site; System Recovery and Reconstitution | Crosswalk | CP-7: Alternate processing site; NIST's CSF 2.0 references don't link CP-7 to these subcategories. CP-10: via RC.RP-02; RC.RP-05 |
| HIPAA | §164.308(a)(7)(ii)(B)§164.308(a)(7)(ii)(D) | Disaster Recovery Plan; Testing and Revision Procedure | Crosswalk | §164.308(a)(7)(ii)(B): via NIST HIPAA map: CP-10 §164.308(a)(7)(ii)(D): Testing and revision of contingency plans; NIST maps it to CP-2/CP-3/CP-4. |
| GDPR | Art.32(1)(c) | Security of processing | Editorial | Art.32(1)(c): No official crosswalk exists for GDPR; ControlMapping editorial mapping. |
| NIS2 | 4.14.2 | Business continuity and disaster recovery plan; Backup management | Crosswalk | 4.1: via RC.RP-02; ENISA ISO map: A.5.30 4.2: via RC.RP-02; ENISA ISO map: A.8.14 |
| Essential Eight | ISM-1515 | Restoration of data, applications and settings from backups to a common point in time… | Editorial | ISM-1515: ASD assigns these ISM controls to the Essential Eight; ASD publishes no crosswalk to NIST or ISO, so linking them to topics is ControlMapping editorial. |
| DORA | Art.12(4)Art.11(6) | Backup policies and procedures, restoration and recovery procedures and methods; Response and recovery | Editorial | Art.12(4): Redundant ICT capacities adequate to business needs. Art.11(6): Testing includes switchovers between primary infrastructure and redundant capacity, backups and facilities. |
| CPS 234 | — | Tidak ada persyaratan | Tidak ada pemetaan dalam data kami | Tidak ada persyaratan CPS 234 yang dipetakan ke topik ini dalam data kami. |
| Cyber Essentials | — | Tidak ada persyaratan | Tidak ada pemetaan dalam data kami | Tidak ada persyaratan Cyber Essentials yang dipetakan ke topik ini dalam data kami. |
Definisi topik Hasil CSF 2.0 yang mendefinisikan topik ini · Crosswalk setidaknya satu pilihan didukung crosswalk yang dipublikasikan · Editorial Penilaian ControlMapping, beserta alasannya · belum dipetakan, hanya berbagi hasil CSF untuk topik ini · Tidak ada pemetaan dalam data kami belum ada yang dipetakan dalam data kami; sering kali pekerjaan baru, tetapi periksa catatan cakupannya. Metodologi.
ID dan judul persyaratan ditampilkan sebagaimana diterbitkan masing-masing framework, dalam bahasa Inggris.
Pemetaan salah atau belum ada? Laporkan
Tentang Pemulihan Bencana
Pemulihan bencana (DR) menyediakan kemampuan teknis dan prosedur yang diperlukan untuk memulihkan infrastruktur TI, aplikasi, dan data setelah peristiwa katastrofik seperti serangan ransomware, gangguan pusat data, atau bencana alam. Perencanaan DR mencakup penetapan recovery time objective (RTO) dan recovery point objective (RPO) untuk setiap sistem kritis, pembangunan infrastruktur redundan atau lingkungan failover berbasis cloud, serta pendokumentasian prosedur pemulihan langkah demi langkah. Pengujian rutin, hingga failover penuh apabila risikonya membenarkannya, menunjukkan apakah target pemulihan benar-benar dapat dicapai dan apakah staf mampu menjalankan prosedur tersebut.