Recuperación ante desastres
Planificar y ejecutar los procedimientos de recuperación ante desastres.
Recuperación ante desastres se define por los resultados de NIST CSF 2.0 RC.RP-02 (Recovery actions are selected, scoped, prioritized, and performed); RC.RP-05 (The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed); PR.IR-03 (Mechanisms are implemented to achieve resilience requirements in normal and adverse situations). Correspondencia Con correspondencia a través de un crosswalk publicado en ISO 27001, PCI DSS, 800-53, HIPAA y NIS2. Editorial Con correspondencia editorial en CIS v8.1, SOC 2, GDPR, Essential Eight y DORA. Solo relación tangencial en CMMC. Sin correspondencia en nuestros datos Sin correspondencia en nuestros datos para CPS 234 y Cyber Essentials.
| Marco | Requisito | Título | Vínculo | Fuente / motivo |
|---|---|---|---|---|
| NIST CSF 2.0 | RC.RP-02RC.RP-05PR.IR-03 | Recovery actions are selected, scoped, prioritized, and performed; The integrity of restored assets is verified, systems and services are restored, and normal operating status is confirmed; Mechanisms are implemented to achieve resilience requirements in normal and adverse situations | Definición del tema | RC.RP-02 RC.RP-05 PR.IR-03 |
| ISO 27001 | A.5.30A.8.14 | ICT readiness for business continuity; Redundancy of information processing facilities | Correspondencia | A.5.30: via RC.RP-02 A.8.14: via PR.IR-03 |
| CIS v8.1 | CIS 11.1 | Establish and Maintain a Data Recovery Process | Editorial | CIS 11.1: Establish a data recovery process; not in CIS's own crosswalk to CSF 2.0, which covers 49 of 153 safeguards. |
| SOC 2 | A1.2A1.3 | Environmental protections, backups and recovery infrastructure; Testing recovery plan procedures | Editorial | AICPA's TSC mappings are not openly licensed; ControlMapping editorial mapping (criterion summaries are ours, not AICPA text). |
| PCI DSS | 12.10.1 | Incident response plan ready to activate | Correspondencia | 12.10.1: via RC.RP-02; PR.IR-03 |
| CMMC | IR.L2-3.6.1SC.L2-3.13.2 | No asignado a este tema | Estos requisitos solo comparten los resultados de CSF de este tema (RC.RP-02, RC.RP-05, PR.IR-03) mediante crosswalks publicados: conviene revisarlos, pero no es una correspondencia. | |
| 800-53 | CP-7CP-10 | Alternate Processing Site; System Recovery and Reconstitution | Correspondencia | CP-7: Alternate processing site; NIST's CSF 2.0 references don't link CP-7 to these subcategories. CP-10: via RC.RP-02; RC.RP-05 |
| HIPAA | §164.308(a)(7)(ii)(B)§164.308(a)(7)(ii)(D) | Disaster Recovery Plan; Testing and Revision Procedure | Correspondencia | §164.308(a)(7)(ii)(B): via NIST HIPAA map: CP-10 §164.308(a)(7)(ii)(D): Testing and revision of contingency plans; NIST maps it to CP-2/CP-3/CP-4. |
| GDPR | Art.32(1)(c) | Security of processing | Editorial | Art.32(1)(c): No official crosswalk exists for GDPR; ControlMapping editorial mapping. |
| NIS2 | 4.14.2 | Business continuity and disaster recovery plan; Backup management | Correspondencia | 4.1: via RC.RP-02; ENISA ISO map: A.5.30 4.2: via RC.RP-02; ENISA ISO map: A.8.14 |
| Essential Eight | ISM-1515 | Restoration of data, applications and settings from backups to a common point in time… | Editorial | ISM-1515: ASD assigns these ISM controls to the Essential Eight; ASD publishes no crosswalk to NIST or ISO, so linking them to topics is ControlMapping editorial. |
| DORA | Art.12(4)Art.11(6) | Backup policies and procedures, restoration and recovery procedures and methods; Response and recovery | Editorial | Art.12(4): Redundant ICT capacities adequate to business needs. Art.11(6): Testing includes switchovers between primary infrastructure and redundant capacity, backups and facilities. |
| CPS 234 | — | Sin requisito | Sin correspondencia en nuestros datos | Ningún requisito de CPS 234 está asignado a este tema en nuestros datos. |
| Cyber Essentials | — | Sin requisito | Sin correspondencia en nuestros datos | Ningún requisito de Cyber Essentials está asignado a este tema en nuestros datos. |
Definición del tema Resultados de CSF 2.0 que definen este tema · Correspondencia al menos una selección respaldada por una tabla de correspondencias publicada · Editorial Criterio editorial de ControlMapping, con el motivo · no asignado; solo comparte los resultados CSF de este tema · Sin correspondencia en nuestros datos no hay nada asignado en nuestros datos; a menudo es trabajo nuevo, pero revisa las notas de cobertura. Metodología.
Los identificadores y títulos de los requisitos se muestran tal como los publica cada marco, en inglés.
¿Asignación incorrecta o que falta? Notificarlo
Acerca de Recuperación ante desastres
La recuperación ante desastres (DR, por sus siglas en inglés) proporciona las capacidades técnicas y los procedimientos necesarios para restaurar la infraestructura de TI, las aplicaciones y los datos tras un evento catastrófico, como un ataque de ransomware, una caída del centro de datos o un desastre natural. La planificación de DR incluye definir los objetivos de tiempo de recuperación (RTO) y los objetivos de punto de recuperación (RPO) para cada sistema crítico, establecer infraestructura redundante o entornos de conmutación por error basados en la nube, y documentar los procedimientos de restauración paso a paso. Las pruebas periódicas, incluida la conmutación por error completa cuando el riesgo lo justifica, demuestran si los objetivos de recuperación pueden cumplirse realmente y si el personal es capaz de ejecutar los procedimientos.